Modernisation optimises DC providing future fit solution

assets/files/oldimages/1590-_DSC0904.jpg

INFORMATION: Free information is available from DEMATIC. Click here to request a copy

Wincanton has awarded Dematic the contract to upgrade its 26,000 square metre distribution centre in Corby.  The modernisation will update the site's highbay cranes, Transfer Cars and conveyors to the latest controls technology.  The planning skills and security of the investment that Dematic offer for long term cooperation along with second to none after sales support were decisive factors.

With the site being in operation since 1995 the technologies required to keep the automated system running had now entered a phase of obsolescence.  This presented numerous issues for Wincanton; parts were becoming more difficult to source resulting in greater time and effort to find alternatives, with increased lead times the stock holding had increased and the technical knowledge to diagnose unfamiliar faults was diminishing.

The stipulation was to ensure a minimum of ten years protection against obsolescence, implement non bespoke hardware and improve the interfaces between the machine and the support engineers in times of fault rectification.

"The increasing risk to our business through obsolescence to supply our end customers was becoming a major concern for us, any downtime has an impact on us meeting deadlines.  Any hardware failure, especially of an intermittent nature, would be a real challenge to diagnose." Said Paul Hipwell, Engineering Manager, Wincanton Corby.

"Dematic were able to demonstrate a real understanding of our needs and worked closely with us to propose an upgrade path to our system that would ensure the removal of the risks associated with obsolescence, fit around our business needs when being implemented and give enhanced diagnostics for any fault rectification."

Dematic designed the solution based around three key objectives.   

The eight high bay pallet cranes had the complete ageing control system removed, including the main control panel.  This was replaced with a new panel incorporating Unidrive SP Inverters, a Siemens S7 range PLC and a new touch screen HMI giving enhanced machine control and diagnostics.  The DC motors for all three axis were replaced, this included gearboxes for the X & Z axis.  A new Profibus network was installed onto the machine along with remote I/O modules.  To further enhance the diagnostics a second touch screen was installed within the operator cabin.  

The single pallet pick crane design is following that of the main high bay cranes to ensure commonality of controls and parts.

The three conveyor systems, Infeed, Outfeed and Despatch were all running on the now obsolete Siemens S5 platform.  The upgrade path for these was again the Siemens S7 range of PLCs incorporating the existing I/O network.  A second Profibus network was installed to allow the use of Siemens mobile panels for fault rectification around the conveying system.

The three Transfer Cars used to feed the despatch lanes were now running on obsolete controllers and positioning system.   

Using the Leuze barcode positioning system and Control Techniques Unidrive SP inverters these were brought up to date and used common parts inline with the ASRS equipment, helping to keep spares holding to a minimum.

Finally a second SCADA client was added into the high bay allowing faster local fault analysis and rectification and improved error reporting to identify specific errors.  

The implementation has been in line with the planned business needs of Wincanton with five high bay cranes, two conveyor systems as well as the transfer cars completed.  With Wincanton, Corby now into its peak Christmas period, further upgrade work is on hold until the new year.   

The SRM upgrades have given a higher level of reliability and with the increased diagnostic interfaces, along with remote support capability from Dematic engineers, any fault can now be quickly identified and rectified.  In times of low throughput the site now has the benefit of reducing the overall SRM speeds to help reduce wear and tear on the mechanical interfaces.
 
The conveyor systems are no longer a business risk through obsolescence and component failure, spares released from the two completed upgrades are available for the remaining conveyor system until its completion in the new year.

The Transfer Cars are no longer at risk through component failures and utilising improved positioning systems Dematic have been able to improve their throughput.

Key benefits:
 Removed obsolescence risks to the business

 Modernisation without adversely affecting the current operations

Enhanced graphical interfaces to aid in fault rectification

 Remote support capabilities to all automated equipment now realised